If you have planned a grand repair, it would be nice to draw up a work plan in order to avoid troubles in the future. In the first time, it is necessary to decide on the layout of the room and the approximate arrangement of furniture, household appliances and electrical appliances – the electrical wiring system, the location of the sockets and the cross section of the wires will depend on this.
When redevelopment, do not forget to clarify which walls are supporting, and then be sure to draw up all the changes documented in the relevant organization. If you install a split system or air conditioning, then in advance in the wall you need to break through the strokes, so as not to spoil the already repaired surfaces. It is also advisable to replace the windows at the very beginning, so as not to spoil the wallpaper and not to litter in the room in the future. All the surfaces that need to be plastered must be plastered before there is a need to lay the screed. Otherwise, the screed will have to be done twice. And also, when laying the screed, do not forget about waterproofing. After that, you can already start laying tiles in the bathroom and toilet as well as wiring plumbing.
So, go further – wrapping wallpaper. Do not neglect the testing of the walls for dryness, because if the walls are not dry enough, and you stick wallpaper, then, most likely, sooner or later, mold or fungus will appear under the wallpaper. Before the wallpaper, you need to install boxes of interior doors.
The next moment, it will be possible to lay the coating on the floor only a month after laying a cement screed, if it is a laminate, carpet, linoleum or parquet. But if you need to put the tile on the screed, then three days are enough here.
Well, the installation of skirting boards in all rooms and platbands of interior doors will be the state.