By the nature of its constructive device, in contrast to the previously used buildings of the series 1-511 and other. The large -panel house requires accurate accounting of the features of the relief, or, as they say, the placement of buildings “along the horizontals”. This important circumstance significantly influenced the adoption of the architectural solution of the quarters, as it forced the authors in the process of finalizing the outline project to more fully use natural conditions. Now the arrangement of a significant number of residential buildings was carried out with more thoughtful accounting of the outlines of the relief, and in this sense, a new planning solution is significantly different from the initial. The use of typical projects of residential buildings in the area of only one series creates favorable prerequisites for the introduction of advanced construction methods. However, it should be said that in this case an excessively strict restriction of the types of structures was carried out, since only one type of building was proposed for a large residential array – four sectional five -story residential building. Thus, creating the composition of the development, the authors were forced to operate only with the same volumes. Naturally, such a restriction of terms for the formation of such an extensive complex cannot but impover the general architectural solution. As we have already seen with other examples, the transition to a five-story building entailed a significant processing of the entire architectural and planning solution. There was a need for the construction of separate stores, since in the adopted standard projects of five -story residential buildings, the first floors are used only under housing. In this regard, the compositional construction of the development of Mazilov has changed, especially along the front of the highways, along which eight -story buildings with built -in stores were previously designed. The transition from the eight -story building to five -storey buildings led to the liquefaction of the density of the housing. Now it is an average of 4,400 m11G, and the total living area in the area is -270 thousand. M2.
Projects of residential buildings: how to do it yourself
6