Preparatory work on the construction of the launch complex of the camp 3600 began in 1966., oxygen -converter workshop – in September 1973.
With a three -year construction duration in accordance with SN 440-72, 3600 is provided by analogy with the village of 2000, the development of capital investments for the first year 13, the second – 44, the third year – 43%, and the development of the estimated volume of construction and installation works, respectively, for the first year 18, on the second – 50, on the third – 32%. In fact, but the reporting data of the Azovstal plant in accordance with the annual plans for the development of capital investments, for 1966 – 1968. 3.9% of the estimated cost of construction and installation works on the complex of the first stage of the camp 3600; For 1969.-2.6%; For 1970.- 10.7%; For 1971.- 19.8%; in 1972.- 28.7%. In just 6.5 years, 3600 have been mastered by 130 million. rub., or 65.7%. In 1973. 67.7 million remains. rub., or 34.3%.
The remainder for the main types of work for 1973. compiled by: Earthly-1691 m3, or 12.1 %; laying monolithic concrete and reinforced concrete – 180.1 thousand. M3, or 26%; installation of prefabricated reinforced concrete – 65.2 thousand. M3, or 27.4%; installation of steel structures-20.3 thousand. T, or 24.8%; installation of bridge cranes – 45 pcs., or 66%; installation of technological equipment – 53.7 thousand. T, or 88.5%; masonry of refractory – 4970 m3, or 100%; brickwork 18.5 thousand. M3, or 100%; Electrical installation – 11.34 million. rub., or 70%; installation of plumbing and ventilation – 2.5 million. rub., or 46.3%; installation of thermal insulation – 0.9 million. RUB :, or 90%. It remained to make 3600 of the prefabricated reinforced concrete 42.5 thousand in factories for the camp. M3, steel structures – 11.7 thousand. T.
If your company needs leasing, you need to contact reliable specialists who know their work very well. Today you can find leasing calculator easily online.