To assemble the frame, I need the following lumber: board 150×50 – on the walls; Board 200×50 – floor lags 1 and 2 floors, as well as rafters; Brill 150×150 – on the lower strapping; Board 100×50 – internal walls (not bearing); Board 100×25 – on the casing of the frame and the crate of the roof; bar 50×50 – just in case.
Reinforcement will also be required for the foundation (more on this in the next chapter) and roofing material. Below I bring a purchase list. All this was brought in two high -sides trucks (KamAZ and ZIL)…
Reinforcement 10 mm
180m
Barus 150×150
11pcs
Board 150×50
120pcs
Board 200×50
100pcs
Board 100×25
200pcs
Board 50×100
80pcs
Brook 50×50
10pcs
Ruberoid RKP-350
20rulons
..and dumped in the snow. Then my dad and my brother helped me and the three of us put our future home for storage. It took about two days (if you work 5-6 hours a day). Three heaps came out of the materials.
It was best, of course, it was possible to fold the material under a canopy, but I decided to just cover with roofing material on top.
A pile width of about 2 meters. Each has two rows of supports with a step of 1-1.5 meters at the base (somewhere a foundation block, somewhere brick, and somewhere a piece of a piece), 100×50 boards sawed 2 meters, and across the boards, and across the boards, and across the boards The material lies on top. The boards are laid out in layers, a plank of 2 meters is laid across each layer across each layer.
Grouped Brill Brill Brick 150x150mm. All material all material
All this was so left for six months.
Squirrel notes are good if you have prepared a bridgehead for storing building materials in advance. Why for storage? Because I always have a smile and unwillingness to read advertising materials like “House for 5 days”. After all, we spent only on the foundation almost all summer. It is good if the foundation is ready for the purchase of the material, the bars around the perimeter are fixed, the floor lags are exhibited: you can safely add the material on them.
Try to lay out the material evenly, it is advisable to fold more at the edges and smaller in the middle of the foundation: otherwise the floor lags can be very bending. Make sure that the material does not protrude beyond the perimeter of the foundation, it is even better to retreat from each side inside the wall thickness: after all, the walls will be installed around the perimeter.